Monday, September 29, 2014
Week 7
Goal: This week the main objective was to start working on the go-kart and we made big progress.We started to wire the batteries and The Pot-Box we also mounted a flag switch at the rear of the go-kart we also started working on a second pedal for the car.
(Mounted flag switch, Pot-Box and batteries)
(Mounted flag switch, Pot-Box and batteries)
Saturday, September 27, 2014
Week 6
This week, the main goal is to work on the SK2. While the tires are getting done the main objective is getting the Motor and charge controller mounted. The wheels also have to be taken off so the tires can be worked on.
1)We plan to mount the charge controller and the motor controller by drilling holes
to mount the parts.
2)We also plan to get the tires inflated, we removed the tubes and took
the tires off the rim.
Monday, September 22, 2014
Week 6
We got a lot done this week, we managed to get the wheels of so we could get those dealt with, we also drilled some holes to hold
the charge controller and the motor controller.
Drilling
Bolted down charge and motor controller
We were able to blot down the charge controller and the motor controller
the charge controller and the motor controller.
Drilling
We were able to blot down the charge controller and the motor controller
Friday, September 19, 2014
Week 5
We managed to get all the cleaning done and we also took the tires off the SK2 to get them inflated. We learned how to sauter and how to properly cut wires.
(Taking the wheels off)
(Sautering and wire clipping)
Monday, September 15, 2014
Week 5: Cleaning
This week we have a lot of cleaning to do, we took apart the wheels the previous week and all we have to do now is clean the individual parts. The hubs and calipers we really dirty and needed heavy duty cleaning. We used de-greaser, cotton swabs and rags to clean the parts individually.
(Hub)
Besides cleaning we didn't do much, we were able to clean all
the dirty parts bagged them.
Friday, September 12, 2014
Week 4(End)
This week removed the wheels from the SK3, we also removed the breaks and let out the breaking fluid that was inside the breaks.
We also started to clean the some of the parts and eventually we will put the wheels back on.
We also started to clean the some of the parts and eventually we will put the wheels back on.
Sunday, September 7, 2014
Week 4
This week we plan on completely removing the wheels and the breaking mechanism.
Were also going to clean the parts so the car runs smoother.
Were also going to clean the parts so the car runs smoother.
Friday, September 5, 2014
Week 3 (End)
This week we plan on putting the SK3 together for Friday.
we used zip ties to hold the car together.
Monday, September 1, 2014
Week 3
This week we plan on working on the SK2 as well as the SK3, the wheels need to be worked on and we also need part for the cars.