Monday, September 22, 2014

Week 6

We got a lot done this week, we managed to get the wheels of so we could get those dealt with, we also drilled some holes to hold
             the charge controller and the motor controller.

                                              Drilling


                                                Bolted down charge and motor controller

                        We were able to blot down the charge controller and the motor controller

No comments:

Post a Comment